Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2269

User Task Duration Reports show non-user task flow nodes

    Details

    • Type: Bug Report
    • Status: Done
    • Priority: L3 - Default
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 2.5.0
    • Component/s: backend
    • Labels:

      Description

      given:

      • I have a user task duration view report

      when:

      • I group by flow nodes

      then:

      • I see results for all flow nodes

      expected:

      • I probably should not see all flow nodes, but only user task flow nodes.

      Hint:

      • We need to think about what to do with the Show Flow Node configuration in the user task view.
      • Create a separate front-end ticket for the issues Sebastian mentioned in the comment.

        Issue Links

          Activity

          Hide
          sebastian.stamm Sebastian Stamm added a comment -

          Franz Heidl and I discussed this topic and agreed on the following:

          We should change the user task duration report in the following way:

          • The result contains only usertasks and only those usertasks that are not in the hidden nodes array (change in the backend)
          • For the Show Flow Node configuration: (changes in the frontend)
            • The user cannot interact with non-usertaks flow nodes
            • The state of non-usertask flow nodes in the hiddenNodes array cannot be changed in the user task duration report configuration (except by resetting to default), meaning: It is not possible to add any non-usertask to hidden nodes and it is not possible to remove any non-usertask from hidden nodes
          Show
          sebastian.stamm Sebastian Stamm added a comment - Franz Heidl and I discussed this topic and agreed on the following: We should change the user task duration report in the following way: The result contains only usertasks and only those usertasks that are not in the hidden nodes array (change in the backend) For the Show Flow Node configuration: (changes in the frontend) The user cannot interact with non-usertaks flow nodes The state of non-usertask flow nodes in the hiddenNodes array cannot be changed in the user task duration report configuration (except by resetting to default), meaning: It is not possible to add any non-usertask to hidden nodes and it is not possible to remove any non-usertask from hidden nodes

            People

            • Assignee:
              Unassigned
              Reporter:
              felix.mueller Felix Müller
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: