Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2314

User Task Reports: show only User Tasks in Flow Node configuration

    Details

    • Type: Task
    • Status: Done
    • Priority: L3 - Default
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 2.5.0
    • Component/s: frontend
    • Labels:
      None

      Description

      AT:

      For user task duration reports only, in the Show Flow Node configuration:

      • The user cannot interact with non-usertaks flow nodes
      • The state of non-usertask flow nodes in the hiddenNodes array cannot be changed in the user task duration report configuration (except by resetting to default), meaning: It is not possible to add any non-usertask to hidden nodes and it is not possible to remove any non-usertask from hidden nodes

      Note:
      If needed an endpoint similar to Flow Node Names can be provided.

        Issue Links

          Activity

          There are no comments yet on this issue.

            People

            • Assignee:
              Unassigned
              Reporter:
              sebastian.bathke Sebastian Bathke
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: