[OPT-2269] User Task Duration Reports show non-user task flow nodes Created: 20/May/19  Updated: 02/Oct/19  Resolved: 07/Jun/19

Status: Done
Project: Camunda Optimize
Component/s: backend
Affects Version/s: None
Fix Version/s: 2.5.0

Type: Bug Report Priority: L3 - Default
Reporter: Felix Müller Assignee: Unassigned
Resolution: Fixed Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Related
is related to OPT-2233 always show all flownodes in process ... Done
is related to OPT-2314 User Task Reports: show only User Tas... Done

 Description   

given:

  • I have a user task duration view report

when:

  • I group by flow nodes

then:

  • I see results for all flow nodes

expected:

  • I probably should not see all flow nodes, but only user task flow nodes.

Hint:

  • We need to think about what to do with the Show Flow Node configuration in the user task view.
  • Create a separate front-end ticket for the issues Sebastian mentioned in the comment.


 Comments   
Comment by Sebastian Stamm [ 21/May/19 ]

Franz Heidl and I discussed this topic and agreed on the following:

We should change the user task duration report in the following way:

  • The result contains only usertasks and only those usertasks that are not in the hidden nodes array (change in the backend)
  • For the Show Flow Node configuration: (changes in the frontend)
    • The user cannot interact with non-usertaks flow nodes
    • The state of non-usertask flow nodes in the hiddenNodes array cannot be changed in the user task duration report configuration (except by resetting to default), meaning: It is not possible to add any non-usertask to hidden nodes and it is not possible to remove any non-usertask from hidden nodes
Generated at Mon Oct 21 12:26:39 CEST 2019 using JIRA 6.4.6#64021-sha1:33e5b454af4594f54560ac233c30a6e00459507e.